Archive for October, 2011

Viewer Email: 290 HOV
October 28, 2011

Q: Do you know of any reason why the 290 HOV lanes are the only ones that have a three person rule? Just curious…

Jenny D.

A: The occupancy requirement for the 290 diamond lanes is 2+ at all times (this is the non-barrier separated portion). The barrier separated HOV lane is 2+ most of the time, except during morning rush hours (6:45 a.m. – 8a.m.).  The 3+ requirement for the barrier separated HOV has been in place since 1999 due to the level of traffic on this corridor. We continue to monitor the volume of traffic but please note that per the Federal Transit Administration, we are required to maintain traffic flow at 45 mph or higher. – METRO

Advertisements

La Marque Closure: FM 1765
October 26, 2011

As of Monday, Oct 17th : FM 1765 between Delaney Road and FM 2004 in La Marque is closed to through traffic. The closure will allow crews to replace a bridge on FM 1765 that is over a drainage ditch.

Residents of the Saltgrass Crossing subdivision will still have access to FM 1765 from FM 2004. The detour route will be posted. Motorists will be able to use Delaney Road and/or FM 2004 which both run perpendicular to FM 1765 as a detour.  Detour signs will also be posted to assist with traffic control. This closure is expected to last approximately 5 months.

Find Your Towed Car
October 26, 2011

New HPD Site to Help Citizens “Find My Towed Car”

HPD has launched of a new tool that will help the public, HPD personnel and storage lot operators determine where vehicles are stored in the event their vehicle is towed from a location, otherwise known as a non-consent tow. 

The new website, http://www.findmytowedcar.com provides access to information pertaining to vehicles stored as a result of non-consent tows. 

This new system is more time efficient, allows the general public to make inquiries into missing vehicles without repeated phone calls, and the receipt and release of vehicles can be tracked by storage lot owners electronically and in real-time.

Hobby Airport: Roadway Closure
October 25, 2011

A major roadway pavement replacement project will shut down the existing upper-level roadway at William P. Hobby Airport (HOU). The roadway closure will begin in the evening of Wednesday, October 26 and is scheduled to remain in place for approximately one year.

Key points during closure period:

  • The Passenger Drop Off area will be rerouted to the second level of the attached parking garage, slightly further away from the curbside area
  • Drop offs and pickups involving wheelchairs will take place in a designated lane found closest to the terminal
  • Curbside check-in will still be available to Southwest Airlines customers on the ground level/baggage claim area
  • Drivers who are picking up arriving passengers are encouraged to use the Passenger Pick Up Waiting Lot located off of Airport Blvd. to limit congestion.  
  • Parking at Hobby Airport is limited; be prepared to park at the ecopark lots or at other off-site parking lots

Out of The Office
October 16, 2011

 

I’m out of the office for a bit; please look for traffic updates on Twitter at LOCAL2TRAFFIC. There you will find major updates including accident and stall information for your morning drive.

Thanks so much for watching Local 2!

Construction Alert: I-10 at 99
October 8, 2011

IH 10 KATY AT SH 99

 

TxDOT tells us that construction should be complete by the end of 2011.

Construction Alert: I-45 North Frwy
October 7, 2011

I-45 North Freeway

ALTERNATE MAINLANES OF IH 45 NORTH FREEWAY TO BE CLOSED THIS WEEKEND

CLOSED: Multiple mainlanes of IH 45 North Freeway northbound and southbound from Tidwell to IH 610 North Loop

TIME: Friday, October 7 at 10 p.m. until Monday, October 10 at 5 a.m.

OTHER DETAILS: Crews will first close down the southbound lanes of IH 45 North from Tidwell to IH 610 as well as the Airline and Tidwell entrance ramps and Airline and Crosstimbers exit ramps. Motorists can detour to the next available entrance or exit ramp to access the mainlanes or frontage road.

· Once complete, crews will reopen the southbound mainlanes and ramps, and close the northbound lanes of IH 45 North from IH 610 to Tidwell as well as the Crosstimbers entrance ramp and Crosstimbers and Airline exit ramps.

· In addition, crews will close one eastbound lane on the IH 610 North Loop connector to IH 45 North on Sunday, October 9 at 5 a.m. until Monday, October 10 at 5 a.m. Also, the Crosstimbers, Airline and Tidwell intersections at IH 45 North will also be closed. Motorists traveling these roads will have to turn right onto the frontage road and u-turn at the next open intersection.

The closures will alternate between the mainlanes and at least one mainlane will be open at all times. Police officers will be posted at the intersections to assist with traffic flow.

REASON: Crews will mill the existing asphalt pavement and replace it with new asphalt and striping. The work is intended to improve conditions on the heavily-traveled stretch of roadway.

Viewer Email: 45 Gulf at Dixie Farm Rd.
October 2, 2011

 Q: Jennifer,

I have not heard you mention the I-45 major traffic switch at Dixie Farm Rd. some time in the next couple of days.  The northbound sign says it will start tonight at 9:00 pm but the southbound sign I think says 10/01. 

Frank S.

Dickinson

A: Here’s a quote from TxDOT:

Tonight the contractor is removing a large overhead sign structure on the IH 45 north bound main lanes just before the FM 1959/Dixie Farm Rd. exit Thursday night starting at 9:00 PM.  For the contractor to remove the sign structure they will preform a rolling lane closure of the freeway north bound.  This means that the freeway might be stopped for a few minutes while the structure is lifted from it’s foundation and placed in between the main lanes and frontage road.

This weekend the contractor originally scheduled for a traffic switch on the IH 45 north bound main lanes but due to issues with the amount of work they are rescheduling for next weekend starting October 7, 2011 9:00 PM..

They however are still going to switch traffic on IH 45 south bound main lanes starting Saturday 9:00 PM October 1, 2011 until Sunday 8:00 AM October 2, 2011.  The traffic on the south bound main lanes will be detoured onto the temporary south bound main lane detour.

The freeway closure will extend until Monday 5:00 AM October 3, 2011 just in case we run into any issues. – TxDOT